MG2-A XL - Installation
Installation in rigid wall and floor
The product was tested and approved in:
- see the classification overview.
- Mounting is authorised in supporting constructions with a thickness and/or density equal or superior to the supporting construction used during the test, as described in EN 1366-3.
Provide an installation opening of Ød + 3 mm.
Install the plastic pipe in the opening and place the collar around the pipe.
Close the collar with the locking device. Insert the provided axis through the hinges and fold the protective flap.
Use standard screws Ø 6 x 90 mm to affix the collar to the wall/floor.
Place a collar on the other side in the same way.
One collar on the bottom side of the floor is sufficient for floor penetrations.
The pipe must be supported in order to guarantee the well-functioning of the sealing during a fire. Supports and fastenings should be realised according to the rules of good craftsmanship.
General remarks
- The installation must comply with the installation manual and the classification report.
- The pipe must be supported in order to guarantee the well-functioning of the sealing during a fire. Supports and fastenings should be realised according to the rules of good craftsmanship.